41st Street Water Transmission Line Rehabilitation

Project Update 4/23/2021  

Commuter Route Information: 

  • The outside eastbound lane of 41st Street will be closed to traffic while each phase is under construction. 
  • Eastbound traffic will utilize the center turn lane so that two lanes of traffic in each direction will be maintained on 41st Street during construction. 
  • During Phase 2, Valley View Road and Holbrook Avenue will be closed at 41st Street. 
  • Traffic on Valley View Road and Holbrook Avenue will be detoured to Marion Road, Sertoma Avenue, 32nd Street, 49th Street, and Essex Drive.

Project Milestones 

Phase 1

  1. Excavation at access pit locations
  2. Watermain rehabilitation
  3. Fill and pave access pits

Phase 2

  1. Excavation at access pit locations
  2. Watermain rehabilitation
  3. Fill and pave access pits

Phase 3

  1. Excavation at access pit locations
  2. Watermain rehabilitation
  3. Fill and pave access pits

Project Overview

Completion Date:

Fall 2021

Contract Amount: 

TBD

Project Summary:

This project will consist of rehabilitation of the existing 16” diameter and 20” diameter water transmission mains along 41st Street from Sertoma Avenue to Marion Road. Access pits will be excavated periodically throughout the project limits. Work will include rehabilitation of these water transmission mains via trenchless construction methods and restoration of all surfacing at each pit location.

Contact Information

City of Sioux Falls
Raed Yousef
Cell: 605-359-7726
Email: RYousef@siouxfalls.org

Consultant Name:

Banner Associates
Joe Munson
(605) 941-4276
joem@bannerassociates.com

Alex Welbig
(605) 261-8212
alexw@bannerassociates.com

Contractor Name:

TBD