7th Street Cul-de-sac

7th Cul-de-sac

Project Update 4/29/2022  

  • Project is rescheduled for the 2023 construction season due to supply chain challenges and escalating costs experienced throughout our region.

Commuter Route Information: 

(no changes)

  • 7th Street east of Phillips Avenue will be fully closed to vehicles and pedestrians during construction.
  • Access to adjacent properties will be maintained.

Project Milestones 

2023

  1. Removals
  2. Utility Repair and Reconstruction
  3. Grading and Gravel
  4. Surfacing/Paving
  5. Street Lights, Sidewalk, Streetscape
  6. Site Restoration

Sign up for Project Updates

Project Overview

Completion Date:

Fall 2023

Contract Amount: 

TBD

Project Summary:

The City of Sioux Falls will be reconstructing the 7th Street cul-de-sac east of Phillips Avenue. The project will include replacement of underground utilities, street surfacing, streetscape and a new pedestrian connection to the Arc of Dreams.

Contact Information

City of Sioux Falls
Wes Philips
wphilips@siouxfalls.org
605-367-8657

Constultant

Infrastructure Design Group
Project Engineer:

Chad Hanisch
ChadH@infrastructuredg.com
605-271-5527

Contractor Name:

TBD